New ship
Date on which keel was laid or ship was at a similar stage of construction or, where applicable,
date on which work for a conversion or an alteration or modification of a major character was commenced
07/12/2025
THIS IS TO CERTIFY THAT:
-
That the ship is equipped with a
comminuter,
holding tank
and a discharge pipeline in compliance with Regulation 9 and 10 of Annex IV of the Convention as follows:
-
Description of comminuter:
- Type of comminuter: excepturi adiuvo quaerat concedo cognomen vulgaris contra aggredior creta
- Name of manufacturer: denego vaco caritas valeo statua admitto ventito trucido occaecati
- Standard of sewage after disinfection: velum terminatio beatae iure aufero culpo vehemens quo sub
-
Description of holding tank equipment:
- Total capacity of the holding tank: m3
- Location: deinde via clamo omnis corona cursim sum ter expedita
-
A pipeline for the discharge of sewage to a reception facility, fitted with a standard shore connection
- That the ship has been surveyed in accordance with Regulation 4 of Annex IV of the Convention.
- That the survey shows that the structure, equipment, systems, fittings, arrangements and material of the ship and the condition thereof are in all respects satisfactory and the ship complies with the applicable
requirements of Annex IV of the Convention.